[CDATA[ var __cultureInfo = {"name":"en-AU","numberFormat":{"CurrencyDecimalDigits":2,"CurrencyDecimalSeparator":".","IsReadOnly":false,"CurrencyGroupSizes":[3],"NumberGroupSizes":[3],"PercentGroupSizes":[3],"CurrencyGroupSeparator":",","CurrencySymbol":"$","NaNSymbol":"NaN","CurrencyNegativePattern":1,"NumberNegativePattern":1,"PercentPositivePattern":1,"PercentNegativePattern":1,"NegativeInfinitySymbol":"-∞","NegativeSign":"-","NumberDecimalDigits":2,"NumberDecimalSeparator":".","NumberGroupSeparator":",","CurrencyPositivePattern":0,"PositiveInfinitySymbol":"∞","PositiveSign":"+","PercentDecimalDigits":2,"PercentDecimalSeparator":".","PercentGroupSeparator":",","PercentSymbol":"%","PerMilleSymbol":"‰","NativeDigits":["0","1","2","3","4","5","6","7","8","9"],"DigitSubstitution":1},"dateTimeFormat":{"AMDesignator":"AM","Calendar":{"MinSupportedDateTime":"\/Date(-62135596800000)\/","MaxSupportedDateTime":"\/Date(253402253999999)\/","AlgorithmType":1,"CalendarType":1,"Eras":[1],"TwoDigitYearMax":2029,"IsR eadOnly":false},"DateSeparator":"/","FirstDayOfWeek":1,"CalendarWeekRule":0,"FullDateTimePattern":"dddd, d MMMM yyyy h:mm:ss tt","LongDatePattern":"dddd, d MMMM yyyy","LongTimePattern":"h:mm:ss tt","MonthDayPattern":"d MMMM","PMDesignator":"PM","RFC1123Pattern":"ddd, dd MMM yyyy HH\u0027:\u0027mm\u0027:\u0027ss \u0027GMT\u0027","ShortDatePattern":"d/MM/yyyy","ShortTimePattern":"h:mm tt","SortableDateTimePattern":"yyyy\u0027-\u0027MM\u0027-\u0027dd\u0027T\u0027HH\u0027:\u0027mm\u0027:\u0027ss","TimeSeparator":":","UniversalSortableDateTimePattern":"yyyy\u0027-\u0027MM\u0027-\u0027dd HH\u0027:\u0027mm\u0027:\u0027ss\u0027Z\u0027","YearMonthPattern":"MMMM yyyy","AbbreviatedDayNames":["Sun","Mon","Tue","Wed","Thu","Fri","Sat"],"ShortestDayNames":["Su","Mo","Tu","We","Th","Fr","Sa"],"DayNames":["Sunday","Monday","Tuesday","Wednesday","Thursday","Friday","Saturday"],"AbbreviatedMonthNames":["Jan","Feb","Mar","Apr","May","Jun","Jul","Aug","Sep","Oct","Nov","Dec",""],"MonthNames":["January","February","March","April" //

  • Sign in
|

The PCD SEO was Gazetted by the South Australian Government on Thursday, 19 April 2018. 


PrivacyAs LCK moves into the next phase of the project for future exploration work on the Petroleum Exploration Licence 650 (PEL 650); one EIR and SEO for geophysical operations and one EIR and SEO for exploration drilling operations has been prepared, approved and Gazetted by the South Australian Government during late 2019 and early 2020. 

|
  • A copy of the EIR for Geophysical operations can be can downloaded hereCopyright © 2020 Leigh Creek Energy Limited
  • A copy of the SEO for Geophysical operations can be can downloaded here
  • A copy of the EIR for Exploration Drilling operations can be can downloaded here
  • jQuery(document).ready(function () { $('.MenuPaneInner').meanmenu({ meanScreenWidth: "640", meanMenuContainer: ".Page", removeElements: "" }); $(".MobileSelector").tinyNav({ header: 'Please Select' }); $('.Show50').collapser({ mode: 'chars', truncate: 50, controlBtn: 'ShowButton', showText: 'Show more', hideText: 'Show less', speed: 'fast', effect: 'fade', showClass: 'IsOpen', hideClass: 'IsClosed', lockHide: true, }); $('.Show200').collapser({ mode: 'chars', truncate: 200, controlBtn: 'ShowButton', showText: 'Show more', hideText: 'Show less', speed: 'fast', effect: 'fade', showClass: 'IsOpen', hideClass: 'IsClosed', lockHide: false, }); $('.Show2Lines').collapser({ mode: 'lines', truncate: 2, controlBtn: 'ShowButton', showText: 'Show more', hideText: 'Show less', speed: 'fast', effect: 'fade', showClass: 'IsOpen', hideClass: 'IsClosed', lockHide: false, }); $('.Show4Lines').collapser({ mode: 'lines', truncate: 4, controlBtn: 'ShowButton', showText: 'Show more', hideText: 'Show less', speed: 'fast', effect: 'fade', showClass: 'IsOpen', hideClass: 'IsClosed', lockHide: false, }); $('map').imageMapResize(); $(ZebraStripes()); });
  • A copy of the SEO for Exploration Drilling operations can be can downloaded here

Stakeholder feedback is important to LCK and LCK encourages interested stakeholders to provide feedback through the email address Community@lcke.com.au

//

  • Implement the principles of ecologically sustainable development with a balance of social, economic and environmental values; 
  • Achieve and go beyond the minimum legal requirements; 
  • Conserve resources, species and genetic biodiversity; 
  • Prevent pollution and eliminate or reduce waste; 
  • Protect cultural heritage, including both Indigenous and built heritage; 
  • Undertake informed and transparent decision-making; and 
  • Ensure continuous improvement. 

LCK will achieve this by maintaining an effective and robust Environmental Management System (EMS). Furthermore, Leigh Creek Energy will: 

  • Identify goals, objectives, performance indicators and targets, and develop management plans for achieving these; 
  • Clearly define the responsibilities, authorities and accountabilities of employees and contractors; 
  • Develop detailed work practices, procedures or processes to manage and reduce impacts; 
  • Regularly monitor environmental performance and system implementation; 
  • Develop reporting systems to include regular environmental reporting internally and externally to stakeholders; and 
  • Regularly review the continuous improvement of the EMS and of the company's environmental performance. 

Download the LCK Climate Change Policy Statement

 
Leigh Creek Energy aims to achieve a successful Social Licence to Operate by integrating its EMS into its operations.

 

Contact Us

Phone +61 (8) 8132 9100
contactus@lcke.com.au

Get Social

   

Join our Mailing List